In the context of the continuous follow-up of the projects implemented by the Ministry of Transport, the Lt. Gen. / Engineer Kamel, The Minister of Transport held an expanded meeting with the heads of companies implementing the works of establishing the multi-purpose Terminal in Alexandria Port on the Berths from 55 to 62. The meeting was attended by the
Lieutenant General Engineer / Kamel Al-Wazir: The project will contribute to increase Alexandria Port ranking and it is necessary to adhere to specified times forexecuting the terminal to be ready forreceiving the huge ships in the beginning of 2022
During his tour of Alexandria Port to follow up the rates of implementation of a number of important service projects, the Minister of Transport attests the signing of the contract for the construction of the multi-purpose station on the sidewalks at 55/62 at Alexandria Port at a cost of 5 billion Egyptian pounds. The team is a full engineer: the station is one of the most important projects implemented by the Ministry of Transport in the field Maritime transport, and it will contribute to raising the classification of the Alexandria port, receiving ships of large tonnage, and increasing the volume of cargo handling in the port.
Connecting seaports to the "single window" electronically supplying and modernizing the logistics centers in Alexandria, Dekheila, Safaga, Damietta, Examination of the mechanisms of pre-registration of shipments .. and the detection of containers by x-ray The Minister of Transport, Lt. Gen. Engineer \ Kamel al-Wazir and Dr. Muhammad Moait, Minister of Finance, held a meeting, To discuss ways to enhance cooperation in developing the work system in seaports, A gradual shift to a "single window", In order to reduce the release time and costs of customs clearance, And improving Egypt’s ranking in the World Bank’s index, “Facilitating Cross-border Trade,
The team is a full engineer engineer • Great importance for converting Egyptian ports into green ones according to the directions of the political leadership
The Minister of Transport received the first 10 train tractors of a new railway at the port of Alexandria as part of manufacture and supply a contract to 110 new tractors and rehabilitate 81 railway tractors from the current fleet the contract had been held between the Railways Authority and GE Transportation Lieutenant General Engineer / Kamel Elwazer:
Minister of Transport Kamel Al-Wazir held an extensive meeting with the delegations of more than 10 companies of the British Maritime Industries Association, which includes a large number of British companies specialized in port infrastructure, piers, digital technology, marine consultancy and management systems and operation of multi-purpose stations to review investment opportunities in the field of Maritime Transport in Egypt and discussed the possibility of joint cooperation between the two sides in this important vital area
The company will establish, exploit and manage the multi-purpose station on the berths from 55 to 62 in Alexandria port and the areas, squares and adjacent lands. 55 berth 55 project is one of the most important projects that the ministry of transport is undertaking in the field of maritime transport.
Project of Constructing berth 55 in Alexandria Port where it considered from the most important projects which constructed by the ministry of transportation as Alexandria Port is considered one of the most important Egyptian Ports where we export and import the majority of Egyptian cargoes,
Alexandria Port received a delegate from the participants in the second Egyptian and Italian forum about the logistics and maritime transport in its day.