Within the framework of continuous and periodic to follow up the implementation of projects implemented by the Ministry of Transport in conjunction with taking all necessary measures and precautions to ensure the safety and health of workers in various work sites and to continue the great development occurred by the transport sector in Egypt and contribute to achieving the economic development that Egypt is currently experiencing, as well as preserving opportunities The work provided by this sector
Lieutenant General Engineer \ The Minister: The station isone of the most important projects implemented by the Ministry in the field ofmaritime transport, as it will contribute to raising the classification ofAlexandria port, receiving the port for ships of large tonnage.
The Minister of Transport, Lt. Gen. Eng. \ Kamel Al-Wazir,received in Alexandria Port today the second part (20 new railway tractors)within a contract for the manufacture and supply of 110 new tractors and therehabilitation of 81 railway tractors from the current fleet contracted betweenthe Railways Authority and GE Transportation (WABTEC),
An emergency meeting of the concerned authorities in the port of Alexandria to facilitate and accelerate the rates of movement of goods and merchandise, increase the rates of loading and unloading, and develop a scenario to deal with any developments related to the spread of the new Corna virus. This is to facilitate and accelerate the rates of movement of goods, increase the rates of loading and unloading, and develop a scenario to deal with any developments related to the spread of ....
تابع وزير النقل الفريق مهندس كامل الوزير خلال جولته اليوم بميناء الإسكندرية انتظام أعمال الشحن والتفريغ وحركة السفن و البضائع، والإجراءات المتخذة لتسهيل أعمال التصدير والاستيراد للسلع والبضائع الإستراتيجية حيث تفقد الوزير أرصفة 25 ، 26 ، 35 ،36 للتأكد من تطهير وتعقيم شحنات الصادر والوارد من البضائع حيث بلغ إجمالي السفن المتواجدة بالميناء 80 سفينة وتواجد على الأرصفة 40سفينة منهم 7سفن حاويات و6سفن مواد بترولية و23 سفينة بضائع ….
Reda El-Ghandour, spokesman for the General Authority of Alexandria Port, saidthat the port witnesses a 24-hour activity as the natural work movementcontinues at the port operations center, freight and unloading work, themovement of ships and marine parts, the movement of goods, the control ofsquares, the electronic system, and the insurance of individuals andinstallations, This comes within the framework of the directions of the LieutenantGeneral Engineer / Kamel Elwazer the Minister of Transport, that the Cargoesand goods should continue to be received
The Minister of Transport:33 other new railway vehicles that are currently being manufactured in Russia,which will be supplied to Egypt during the coming June. The rest of thevehicles will continue to arrive in batches according to the schedule and at arate of 35 vehicles per month. The Ministry of Transport announced thereception of Alexandria Port today, the first model vehicle within a deal tosupply 1,300 railway vehicles New iron for passengers, which was signed by theRail Agency with the Russian company Transmach, representing theRussian-Hungarian alliance
within the framework of the directions of General Lieutenant \ Kamel ElWazer Minister of Transport, to take the entire necessary measures and tighten the control over seaports and ports to protect the country and citizens from epidemics and trans-boundary virus diseases.
The Ministry of Transport announced in a statement today that the Minister of Transport, Lieutenant General \ Engineer Kamel, receives daily reports from the Chairman of Authorities and subsidiary Companies and from the Ministry's Crisis
The terminal is considered one of the most important projects implemented by the Ministry of Transport in the field of maritime transport and will contribute to raising the .
classification of Alexandria Port and to receive ships with large tonnages and increasing the volume of handling of containerized cargoes in the port