During His Excellency visit to Alexandria Port, the minister of transportation attend the signing of cooperation protocol between Alexandria Port & Bank Misr concerning the electronic payment for services & activities that the authority offers Captain / Tarek Shahin signed on the part of Alex. Port and at the part of Bank Misr is Mr.Hossam port offers.
The Minister of transportation  Admiral / Kamel ElWazeer watched the development works of the Egyptian Authority for maritime safety and project 85/3 (Temper handling terminal) as well as he assured about the great importance to develop the maritime transportation system in Egypt to support the national economy.
The minister of transportation attends the signing of cooperation protocol between Alexandria Port & Bank Misr concerning the electronic payments for services & activities that the authority offered Captain / Tarek Shahin signed on the part of Alex. Port and at the part of Bank Misr is Mr.Hossam ElDen AbdulWahab Vice Chairman of Bank Misr, the minister declared that this protocol is aiming to have the resent models of electronic selling points P.O.S which distinguish with high speed to have details which work by GPRS systems, and also accepting all types of exist electronic cards in Arab Republic of Egypt, he maintained that this protocol determined also that Bank will train the laborers in Authority of how they can use machines and also having all equipment and having the necessary maintenance, Bank Misr also will appoint a responsible for marketing in the Bank to follow the accounts and solve all problems to achieve the best levels of service all the time of the week, he added that this project is a good step of collecting through the collecting sectors in the port to settle daily payments and finish quickly financial procedures for client.
The minister started his visit at Alexandria Port by watching development works, increasing efficiency of departments building in Egyptian Authority of maritime shipping safety where he instructed to finish all works quickly, he pointed to the great role which done by the Egyptian Authority of maritime shipping safety in organizing, administrating maritime shipping safety, this task needs work all time and offer a distinguish service which is suitable for Egypt possession in the world.
Admiral Engineer / Kamel ElWazeer – followed and watched the berth project No. 85/3 (Timber handling Terminal) as 25% has ben achieved, we made the concrete cubes, dredged the first stage with length 120m, putting clean sand layer for foundation with depth 7m, the dredge work of the second stage is started to finish rest of the berth, putting concrete cubes to wall of the berth and he pointed that this project will finish in June 2020.
Berth 85/3 its length 400m, its depth 14.5m, Costs 382 million LE, this berth is dedicated to handle timber and general cargo, with a hinter land yard with area 40.000m.
At the end of his visit the minister watched a presentation for project 85/3 development and what had been achieved during the last time and the rate of executing the projects which are executing in the port. He assured to finish all projects on time and he will control weekly with reports and the executing ratios and he pointed about the great importance of Alexandria Port in Egyptian trade movement. 29-9-2019